EV Charging Stations in Castelló de la Plana/Castellón de la Plana (Castellón/Castelló)

How many EV charging points are there in Castelló de la Plana/Castellón de la Plana?

As of 24/10/2026, the municipality of Castelló de la Plana/Castellón de la Plana (Castellón/Castelló) has a total of 41 active public charging stations, with 162 dedicated charging bays and 175 connectors in service. Maximum power output reaches 320 kW, with 55 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Castelló de la Plana/Castellón de la Plana

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
41
Physical locations
Charging Points
162
Dedicated bays
Active Plugs
175
Operational outlets
Fast Charging
35
≥ 43 kW
Ultra-Fast
20
≥ 150 kW
Max Power
320 kW
Peak recorded

Available Connectors in Castelló de la Plana/Castellón de la Plana

Charging connectors by type in Castelló de la Plana/Castellón de la Plana
Connector TypeActive Plugs
Tipo 2 (Mennekes)126 plugs
CHAdeMO11 plugs
CCS Combo 237 plugs
Schuko (Enchufe doméstico)1 plug

Power Distribution in Castelló de la Plana/Castellón de la Plana

Charging plugs distribution by power in Castelló de la Plana/Castellón de la Plana
Power RatingPlugs
Ultra-fast (≥ 150 kW)20 plugs
Fast (43 to 149 kW)35 plugs
Semi-fast (7.4 to 22 kW)68 plugs
Standard (< 7.4 kW)52 plugs

EV Charging Stations Map in Castelló de la Plana/Castellón de la Plana

41 stations mapped

Interactive EV Charging Map

41 charging stations ready to explore

All EV Charging Locations in Castelló de la Plana/Castellón de la Plana

Verified specs, connector types and speeds from the official ministry registry

22 kW(Semi-fast)✓ Cable24/7

CS-Castellondelaplana-013

Europa (Ciudad Del Transporte),1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
7.4 kW(Semi-fast)24/7

APK2 Juez Borrull

Plaza Juez Borrull S/N
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
250 kW(Ultra-fast)✓ Cable24/7

Castellón, Spain

Partida Bovalar, 57
Operator:Tesla Spain SLU
CCS Combo 2
12 points • 12 plugs
Details
7.4 kW(Semi-fast)24/7

AIECS CASTELLON

Poligono Industrial Fadrell, Bulevar Fuente en Segures, 95 Castellón, Castellón
Operator:FENIE ENERGIA, SA
Schuko (Enchufe doméstico)Tipo 2 (Mennekes)
1 point • 2 plugs
Details
150 kW(Ultra-fast)⚡ 800V✓ Cable24/7

ES-BP-RONDA SUR

Aranda ,21
Operator:CHARGING TOGETHER SL
CCS Combo 2
2 points • 2 plugs
Details
100 kW(Fast)⚡ 800V✓ Cable⛽Estación BP24/7

Estación bp Castello

Casas De La Breva,37
Operator:CHARGING TOGETHER SL
CCS Combo 2CHAdeMO
2 points • 3 plugs
Details
50 kW(Fast)✓ Cable🏬Centro ComercialHorario habitual

CS-Castellondelaplana-006

Parque Comercial Estepark,1
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
4 points • 6 plugs
Details
320 kW(Ultra-fast)⚡ 800V✓ Cable24/7

E-CS-CastellonDeLaPlana-011

Lairon (Ciudad Del Transporte),60
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
10.53 kW(Semi-fast)24/7

61948051050012

Carrer Santa Maria Rosa Molas, 25
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
5.26 kW(Standard)🛒Supermercado Consum24/7

61948051050021

Consum - Avenida Valencia, 48
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)✓ Cable24/7

61942049840002

Av. De Europa, 226, 12006 Castellón De La
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
7 kW(Standard)✓ Cable24/7

Clavé - San Félix

Plaza Clavé S/N
Operator:APK ELECTRIC, S.L.
Tipo 2 (Mennekes)
14 points • 14 plugs
Details
22 kW(Semi-fast)✓ Cable24/7

Hospital General

C/ Covadonga S/N
Operator:APK ELECTRIC, S.L.
Tipo 2 (Mennekes)
28 points • 28 plugs
Details
22 kW(Semi-fast)✓ Cable24/7

Juez Borrull

Plaza Juez Borrull S/N
Operator:APK ELECTRIC, S.L.
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)✓ Cable24/7

Avenida del Mar

Avda. Del Mar 10
Operator:APK ELECTRIC, S.L.
Tipo 2 (Mennekes)
10 points • 10 plugs
Details
11.09 kW(Semi-fast)✓ Cable24/7

Seur Castellón

Avenida Valencia 233
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)
12 points • 12 plugs
Details
50 kW(Fast)✓ Cable⛽Estación Repsol24/7

Repsol ES, CRED Castellon

Avd. De Valencia S/N, Esquina Ronda Sur
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
2 points • 6 plugs
Details
50 kW(Fast)✓ Cable⛽Estación Repsol24/7

Repsol ES, CRED LA MAGDALENA

Cr N-340, 976,7
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details

Frequently Asked Questions in Castelló de la Plana/Castellón de la Plana

How many public EV charging points are there in Castelló de la Plana/Castellón de la Plana?

Castelló de la Plana/Castellón de la Plana currently has 41 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 175 operational charging plugs.

Are fast charging stations available in Castelló de la Plana/Castellón de la Plana?

Yes, Castelló de la Plana/Castellón de la Plana features 55 fast and ultra-fast charging plugs (≥43 kW up to 320 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Castelló de la Plana/Castellón de la Plana?

Public charging infrastructure in Castelló de la Plana/Castellón de la Plana is mainly operated by IBERDROLA CLIENTES S.A.U, EDP CLIENTES SAU, REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.

Closest Neighboring Towns to Castelló de la Plana/Castellón de la Plana with EV Chargers

Physical proximity calculated via GPS Haversine distance from Castelló de la Plana/Castellón de la Plana

All towns in Castellón/Castelló
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.