22 kW• Semi-fast24/7Active in MITECO registry

Hospital Provincial II

Network OperatorAPK ELECTRIC, S.L.
Total Capacity4 bays (4 plugs)
GPS Coordinates39.98479, -0.04719
Official IDXREJLUKPXQOQMPHZIFPB
Official Registry DateJan 28, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Castelló de la Plana/Castellón de la Plana, belonging to the province of Castellón/Castelló (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the APK ELECTRIC, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeXREJLUKPXQOQMPHZIFPB
Post / EVSE Identifier #1Z0T5UYZZDNALBNYLOADNOBLOBBI
Post / EVSE Identifier #2ES*APK*E67d85f1762d566caf20794f7
Post / EVSE Identifier #31
Post / EVSE Identifier #4TMOOVUH1UWRSB1HKJ7PVFNOJVHZ
Post / EVSE Identifier #5ES*APK*E67d85f2814bc98f6ea0094c4
Post / EVSE Identifier #6XWEOG2IYD48VIS0OGGUGJQMZTVA
Post / EVSE Identifier #7ES*APK*E67d85f3d14bc98f6ea0094cf
Post / EVSE Identifier #82YOJX5IWF0YSGP0ELW31YCNLOWX
Post / EVSE Identifier #9ES*APK*E67d85f4c64664ba4700f96e5

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.984789 | Lon: -0.047187View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.