22 kW• Semi-fast24/7Active in MITECO registry

Juez Borrull

Network OperatorAPK ELECTRIC, S.L.
Total Capacity4 bays (4 plugs)
GPS Coordinates39.98373, -0.03548
Official IDCZGJFN6ZRHI3TPGC2QQJ
Official Registry DateJan 28, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Castelló de la Plana/Castellón de la Plana, belonging to the province of Castellón/Castelló (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the APK ELECTRIC, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeCZGJFN6ZRHI3TPGC2QQJ
Post / EVSE Identifier #16AALTJ3D0AGXWJWGNO5FUGG2LKD
Post / EVSE Identifier #2ES*APK*E67e19c7e32dee91ce90167f8
Post / EVSE Identifier #31
Post / EVSE Identifier #4W7UKVRJ2SYGAIESWOXV4U1VA4MV
Post / EVSE Identifier #5ES*APK*E67e19c9132dee91ce9016802
Post / EVSE Identifier #6FQ4DKCOTAKUTRYCLVRIXXCUKWZ1
Post / EVSE Identifier #7ES*APK*E67e19cb981e7e356e207048c
Post / EVSE Identifier #8UPCPFJQW5Q50EEEKRZC2OLCCTYA
Post / EVSE Identifier #9ES*APK*E67e19ccc32dee91ce9016805

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.983733 | Lon: -0.035476View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
80 m away

APK2 Juez Borrull

Plaza Juez Borrull S/N
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.