EV Charging Stations in Almassora (Castellón/Castelló)
As of 24/10/2026, the municipality of Almassora (Castellón/Castelló) has a total of 6 active public charging stations, with 18 dedicated charging bays and 19 connectors in service. Maximum power output reaches 100 kW, with 7 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Almassora
Official consolidated metrics from the public MITECO registry
- Stations
- 6 Physical locations
- Charging Points
- 18 Dedicated bays
- Active Plugs
- 19 Operational outlets
- Fast Charging
- 7 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 100 kW Peak recorded
Available Connectors in Almassora
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 12 plugs |
| CCS Combo 2 | 6 plugs |
| CHAdeMO | 1 plug |
Power Distribution in Almassora
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 7 plugs |
| Semi-fast (7.4 to 22 kW) | 10 plugs |
| Standard (< 7.4 kW) | 2 plugs |
EV Charging Stations Map in Almassora
6 stations mappedInteractive EV Charging Map
6 charging stations ready to explore
All EV Charging Locations in Almassora
Verified specs, connector types and speeds from the official ministry registry
ES_BP_ALMAZORENSE
61943045210004
Pere Cornell
Mercadona, Avda. Castellón, Castellón
Consum - Almassora
Frequently Asked Questions in Almassora
How many public EV charging points are there in Almassora?
Almassora currently has 6 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 19 operational charging plugs.
Are fast charging stations available in Almassora?
Yes, Almassora features 7 fast and ultra-fast charging plugs (≥43 kW up to 100 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Almassora?
Public charging infrastructure in Almassora is mainly operated by CHARGING TOGETHER SL, EDP CLIENTES SAU, ENDESA X WAY, S.L., among other regional networks.
Closest Neighboring Towns to Almassora with EV Chargers
Physical proximity calculated via GPS Haversine distance from Almassora
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.