60 kW• Fast24/7Active in MITECO registry

US_224_Palazuelos_del_Eresma

Calle La Granja, Palazuelos de Eresma (40194), Segovia, Spain
Network OperatorPLENOIL, S.L.
Total Capacity1 bay (1 plug)
GPS Coordinates40.91013, -4.05861
Official ID2024007043
Official Registry DateNov 22, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Palazuelos de Eresma, belonging to the province of Segovia (Castilla y León, Spain). The charging equipment and commercial operation belong to the PLENOIL, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:420 V
Amperage:7.14 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024007043
Post / EVSE Identifier #1COD20240000046255PR00018066
Post / EVSE Identifier #2ES*PLE*E601Z0ZD2FLC2334A006A0
Post / EVSE Identifier #31

Theoretical Charging Times at Maximum Power (60 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~20 min(~0.3 hours)
40 kWh Battery~40 min(~0.7 hours)
60 kWh Battery~1 h(~1 hours)
80 kWh Battery~1 h 20 min(~1.3 hours)

Opening Hours

Viernes (00:00 - 00:00) Miercoles (00:00 - 00:00) Martes (00:00 - 00:00) Lunes (00:00 - 00:00) Sabado (00:00 - 00:00) Jueves (00:00 - 00:00) Domingo (00:00 - 00:00)

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO

Accessibility & Amenities

Accessibility: SI.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.91013 | Lon: -4.05861View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
4.6 km away

SG-Segovia-001

Gerardo Diego,N/A
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
4 points • 6 plugs
Details
22 kW(Semi-fast)
4.9 km away

E-SG-Segovia-001

Navacerrada,7
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
60 kW(Fast)
5.0 km away

US_212_Segovia

Calle Alicante
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.