22 kW• Semi-fast24/7Active in MITECO registry

E-SG-Segovia-001

Navacerrada,7, Segovia (40006), Segovia, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (2 plugs)
GPS Coordinates40.92645, -4.11286
Official ID2024000879
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Segovia, belonging to the province of Segovia (Castilla y León, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000879
Post / EVSE Identifier #1COD20240000019553PR00002589
Post / EVSE Identifier #2ES*IBD*E8897
Post / EVSE Identifier #39460
Post / EVSE Identifier #4COD20240000019554PR00002590
Post / EVSE Identifier #5ES*IBD*E8898
Post / EVSE Identifier #69461

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.926448 | Lon: -4.112856View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
170 m away

US_212_Segovia

Calle Alicante
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
22 kW(Semi-fast)
1.2 km away

E-SG-Segovia-003

Juan Carlos I,22
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
150 kW(Ultra-fast)
1.3 km away

HYC22BZ3242A-

Av. Juan Carlos I, 19, 40006, Segovia, Castilla Y León, Spain
Operator:CEPSA COMERCIAL PETRÓLEO,S.A.U.
CCS Combo 2
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.