11 kW• Semi-fast🏨Hotel / Alojamiento24/7Active in MITECO registry

Hotel ex-convento Mave

Monasterio s/n, C. Mayor Smmv, 31, Aguilar de Campoo (34492), Palencia, Spain
Network OperatorEmerix Systems S.L.
Total Capacity1 bay (1 plug)
GPS Coordinates42.72309, -4.27473
Official ID2024004834
Official Registry DateAug 14, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Aguilar de Campoo, belonging to the province of Palencia (Castilla y León, Spain). The charging equipment and commercial operation belong to the Emerix Systems S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 1 (Yazaki)
11 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:220 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004834
Post / EVSE Identifier #1COD20240000039411PR00012540
Post / EVSE Identifier #2ES*MRX*E*742352707
Post / EVSE Identifier #3742352707

Theoretical Charging Times at Maximum Power (11 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~1 h 49 min(~1.8 hours)
40 kWh Battery~3 h 38 min(~3.6 hours)
60 kWh Battery~5 h 27 min(~5.5 hours)
80 kWh Battery~7 h 16 min(~7.3 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
✓COMPATIBLE CON TARJETAS CON CHIP
✓PAGO CON TARJETA DE CRÉDITO
✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN
📅Advance slot reservation supported

Accessibility & Amenities

Accessibility: SI. Additional amenities: HOTEL

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.7230916 | Lon: -4.2747332View on OpenStreetMap →

Other Nearby Charging Stations

150 kW(Ultra-fast)🏨Hotel / Alojamiento
7.1 km away

TotalEnergies - Hotel Rest. Los Olmos

Poligono Industrial De Aguilar De Campoo
Operator:TotalEnergies Charging Services España, SLU
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
4 points • 4 plugs
Details
7.4 kW(Semi-fast)
7.5 km away

Aguilar de Campoo (2)

Paseo del Soto, 9 Aguilar de Campoo, Palencia
Operator:FENIE ENERGIA, SA
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.