7.4 kW• Semi-fast24/7Active in MITECO registry

Aguilar de Campoo (2)

Paseo del Soto, 9 Aguilar de Campoo, Palencia, Aguilar de Campoo (34800), Palencia, Spain
Network OperatorFENIE ENERGIA, SA
Total Capacity1 bay (2 plugs)
GPS Coordinates42.78900, -4.25803
Official ID2024006767
Official Registry DateNov 15, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Aguilar de Campoo, belonging to the province of Palencia (Castilla y León, Spain). The charging equipment and commercial operation belong to the FENIE ENERGIA, SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006767
Post / EVSE Identifier #1COD20240000045528PR00017472
Post / EVSE Identifier #2ES*FEN*E*0502
Post / EVSE Identifier #31
Post / EVSE Identifier #42

Theoretical Charging Times at Maximum Power (7.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 42 min(~2.7 hours)
40 kWh Battery~5 h 24 min(~5.4 hours)
60 kWh Battery~8 h 6 min(~8.1 hours)
80 kWh Battery~10 h 49 min(~10.8 hours)

Opening Hours

24/7

Supported Payment Methods

📅Advance slot reservation supported
💳RFID Card / Keyfob reader
🔓Remote plug unlock supported
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Accessibility: NO. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.7889983 | Lon: -4.25802792View on OpenStreetMap →

Other Nearby Charging Stations

150 kW(Ultra-fast)🏨Hotel / Alojamiento
690 m away

TotalEnergies - Hotel Rest. Los Olmos

Poligono Industrial De Aguilar De Campoo
Operator:TotalEnergies Charging Services España, SLU
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
4 points • 4 plugs
Details
7.4 kW(Semi-fast)
970 m away

AGUILAR DE CAMPOO

Barrio Jose Gómez Briz S/N Aguilar de Campoo, Palencia
Operator:FENIE ENERGIA, SA
Schuko (Enchufe doméstico)Tipo 2 (Mennekes)
1 point • 2 plugs
Details
11 kW(Semi-fast)🏨Hotel / Alojamiento
7.5 km away

Hotel ex-convento Mave

Monasterio s/n, C. Mayor Smmv, 31
Operator:Emerix Systems S.L.
Tipo 1 (Yazaki)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.