EV Charging Stations in Durango (Bizkaia)

How many EV charging points are there in Durango?

As of 24/10/2026, the municipality of Durango (Bizkaia) has a total of 4 active public charging stations, with 26 dedicated charging bays and 28 connectors in service. Maximum power output reaches 150 kW, with 8 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Durango

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
4
Physical locations
Charging Points
26
Dedicated bays
Active Plugs
28
Operational outlets
Fast Charging
4
≥ 43 kW
Ultra-Fast
4
≥ 150 kW
Max Power
150 kW
Peak recorded

Available Connectors in Durango

Charging connectors by type in Durango
Connector TypeActive Plugs
Tipo 2 (Mennekes)20 plugs
CCS Combo 26 plugs
CHAdeMO2 plugs
Operators in Durango:

Power Distribution in Durango

Charging plugs distribution by power in Durango
Power RatingPlugs
Ultra-fast (≥ 150 kW)4 plugs
Fast (43 to 149 kW)4 plugs
Semi-fast (7.4 to 22 kW)16 plugs
Standard (< 7.4 kW)4 plugs

EV Charging Stations Map in Durango

4 stations mapped

Interactive EV Charging Map

4 charging stations ready to explore

All EV Charging Locations in Durango

Verified specs, connector types and speeds from the official ministry registry

22 kW(Semi-fast)✓ Cable24/7

BI-Garai-001

San Migel,6
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7.3 kW(Standard)✓ Cable24/7

BI-Garai-002

San Migel,20
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)24/7

E-BI-Durango-003

San Roke Auzoa,22
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
150 kW(Ultra-fast)⚡ 800V✓ Cable24/7

BI-DURANGO-005

Astolabide Kalea,18
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
18 points • 20 plugs
Details

Frequently Asked Questions in Durango

How many public EV charging points are there in Durango?

Durango currently has 4 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 28 operational charging plugs.

Are fast charging stations available in Durango?

Yes, Durango features 8 fast and ultra-fast charging plugs (≥43 kW up to 150 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Durango?

Public charging infrastructure in Durango is mainly operated by IBERDROLA CLIENTES S.A.U, among other regional networks.

Closest Neighboring Towns to Durango with EV Chargers

Physical proximity calculated via GPS Haversine distance from Durango

All towns in Bizkaia
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.