22 kW• Semi-fast24/7Active in MITECO registry

BI-Garai-001

San Migel,6, Durango (48200), Bizkaia, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (2 plugs)
GPS Coordinates43.19377, -2.60961
Official ID2024000462
Official Registry DateJan 19, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Durango, belonging to the province of Bizkaia (País Vasco, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000462
Post / EVSE Identifier #1COD20240000018644PR00001359
Post / EVSE Identifier #2ES*IBD*E156493
Post / EVSE Identifier #3165963
Post / EVSE Identifier #4COD20240000018645PR00001360
Post / EVSE Identifier #5ES*IBD*E156494
Post / EVSE Identifier #6165964

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Miercoles (00:00 - 23:59) Lunes (00:00 - 23:59) Sabado (00:00 - 23:59) Martes (00:00 - 23:59) Domingo (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.19377 | Lon: -2.609608View on OpenStreetMap →

Other Nearby Charging Stations

7.3 kW(Standard)
150 m away

BI-Garai-002

San Migel,20
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
100 kW(Fast)🏨Hotel / Alojamiento
2.7 km away

Hotel San Blas

Laubideta, 7
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)
3.8 km away

E-BI-Berriz-002

Eitua,33
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.