11 kW• Semi-fast24/7Active in MITECO registry

Seur Mérida

Pol. Ind. El Prado, R. 73, Mérida (06800), Badajoz, Spain
Network OperatorREPSOL SOLUCIONES ENERGÉTICAS SA
Total Capacity2 bays (2 plugs)
GPS Coordinates38.92403, -6.37545
Official IDEF5U0KNI1C1MIHBNX7EP
Official Registry DateFeb 25, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Mérida, belonging to the province of Badajoz (Extremadura, Spain). The charging equipment and commercial operation belong to the REPSOL SOLUCIONES ENERGÉTICAS SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeEF5U0KNI1C1MIHBNX7EP
Post / EVSE Identifier #1LVGTRN38MR7KPOFE45CJRMPMBFJ
Post / EVSE Identifier #2ES*REP*E11439*1
Post / EVSE Identifier #31
Post / EVSE Identifier #48WSUIJEG4IBF8IJKF0O2QRDGAJM
Post / EVSE Identifier #5ES*REP*E11439*2
Post / EVSE Identifier #62

Theoretical Charging Times at Maximum Power (11 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~1 h 49 min(~1.8 hours)
40 kWh Battery~3 h 38 min(~3.6 hours)
60 kWh Battery~5 h 27 min(~5.5 hours)
80 kWh Battery~7 h 16 min(~7.3 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.924028 | Lon: -6.375449View on OpenStreetMap →

Other Nearby Charging Stations

250 kW(Ultra-fast)
180 m away

Merida, Spain

Rest Via De La Plata, C. Las Palmas 17
Operator:Tesla Spain SLU
CCS Combo 2Tipo 2 (Mennekes)
14 points • 24 plugs
Details
22 kW(Semi-fast)
300 m away

Decathlon Mérida

Polígono Industrial El Prado, C. Las Palmas
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
3 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.