22 kW• Semi-fast24/7Active in MITECO registry

Port de Roses - SELBA EdRSR 1

Port De Roses, S/N, Roses (17480), Girona, Spain
Network OperatorEtecnic Movilidad Electrica, SRL
Total Capacity8 bays (8 plugs)
GPS Coordinates42.25659, 3.18135
Official IDJ8EGXFBMAW33GE5TGOZW
Official Registry DateJul 14, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Roses, belonging to the province of Girona (Cataluña, Spain). The charging equipment and commercial operation belong to the Etecnic Movilidad Electrica, SRL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:24 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeJ8EGXFBMAW33GE5TGOZW
Post / EVSE Identifier #1M8QFUKCQD3KSRODE1E4QYLDS3CF
Post / EVSE Identifier #2ES*ETE*E16096
Post / EVSE Identifier #3325771
Post / EVSE Identifier #4FLQZGQCN2GN88FKQ7SJMNDIJJYF
Post / EVSE Identifier #5ES*ETE*E16097
Post / EVSE Identifier #6325772
Post / EVSE Identifier #77UEXVVCMTKEKIJFPQGFCG55UON8
Post / EVSE Identifier #8ES*ETE*E15993
Post / EVSE Identifier #9325676
Post / EVSE Identifier #106HWWANVBIVWYTHUTHSXGQHPNHFC
Post / EVSE Identifier #11ES*ETE*E15994
Post / EVSE Identifier #12325677
Post / EVSE Identifier #13YDIAZIQCHC2AF3LGMSYI7Y1PLSB
Post / EVSE Identifier #14ES*ETE*E15995
Post / EVSE Identifier #15325678
Post / EVSE Identifier #16W5W35NTKEUOVL5IDGD2P7ZLMRYN
Post / EVSE Identifier #17ES*ETE*E15996
Post / EVSE Identifier #18325679
Post / EVSE Identifier #19MR5VZ78IDBBV1TCPMVVFUUYSC1I
Post / EVSE Identifier #20ES*ETE*E15989
Post / EVSE Identifier #21325672
Post / EVSE Identifier #22F5CUUWL4RH81LN4RAAAFRSDXA7O
Post / EVSE Identifier #23ES*ETE*E15990
Post / EVSE Identifier #24325673

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.256592 | Lon: 3.181355View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
1.9 km away

E-GI-Roses-001

Jacinto Benavente,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)
4.5 km away

GI-CASTELLODEMPURIES-001

Salins I Linea,S/N
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
4 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.