EV Charging Stations in Roses (Girona)
As of 24/10/2026, the municipality of Roses (Girona) has a total of 8 active public charging stations, with 23 dedicated charging bays and 23 connectors in service. Maximum power output reaches 100 kW, with 6 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Roses
Official consolidated metrics from the public MITECO registry
- Stations
- 8 Physical locations
- Charging Points
- 23 Dedicated bays
- Active Plugs
- 23 Operational outlets
- Fast Charging
- 6 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 100 kW Peak recorded
Available Connectors in Roses
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 17 plugs |
| CCS Combo 2 | 5 plugs |
| CHAdeMO | 1 plug |
Power Distribution in Roses
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 6 plugs |
| Semi-fast (7.4 to 22 kW) | 17 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Roses
8 stations mappedInteractive EV Charging Map
8 charging stations ready to explore
All EV Charging Locations in Roses
Verified specs, connector types and speeds from the official ministry registry
SN2207271660
Av. Rhode, 67
Roses - SELBA EdRSR 2
Port de Roses - INGETEAM EdRSR 3
Port de Roses - SELBA EdRSR 1
Estación bp Rally Moll
Burger King - Roses Girona
Frequently Asked Questions in Roses
How many public EV charging points are there in Roses?
Roses currently has 8 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 23 operational charging plugs.
Are fast charging stations available in Roses?
Yes, Roses features 6 fast and ultra-fast charging plugs (≥43 kW up to 100 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Roses?
Public charging infrastructure in Roses is mainly operated by Etecnic Movilidad Electrica, SRL, CHARGING TOGETHER SL, IBERDROLA CLIENTES S.A.U, among other regional networks.
Closest Neighboring Towns to Roses with EV Chargers
Physical proximity calculated via GPS Haversine distance from Roses
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.