100 kW• Fast24/7Active in MITECO registry

Petrol Station A Rúa

Rúa Campo Grande, 59, Rúa, A (32350), Ourense, Spain
Network OperatorWENEA EMOBILITY SERVICES S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates42.39606, -7.10639
Official ID2024006777
Official Registry DateNov 19, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Rúa, A, belonging to the province of Ourense (Galicia, Spain). The charging equipment and commercial operation belong to the WENEA EMOBILITY SERVICES S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006777
Post / EVSE Identifier #1COD20240000045678PR00017491
Post / EVSE Identifier #2ES*WEN*EPETROARUA12
Post / EVSE Identifier #318301c48-d708-0ad9-1c44-6e81a1c6ad72
Post / EVSE Identifier #4COD20240000045679PR00017492
Post / EVSE Identifier #5ES*WEN*EPETROARUA11
Post / EVSE Identifier #68474bec8-dc93-5e2f-2849-0e2427d8d20d

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Lunes (00:00 - 23:59) Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59) Domingo (00:00 - 23:59) Viernes (00:00 - 23:59) Miercoles (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.396058 | Lon: -7.106389View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
3.1 km away

OU-Sobreira-001

Nacional 120,463
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
4 points • 5 plugs
Details
22 kW(Semi-fast)
9.2 km away

E-OU-Viloira-001

Galicia,3
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
60 kW(Fast)
10.2 km away

C6E06BCC22TTYWTAUJ

Vila Do Castro, 32318 El Barco De
Operator:ENDESA X WAY, S.L.
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.