EV Charging Stations in Rúa, A (Ourense)

How many EV charging points are there in Rúa, A?

As of 24/10/2026, the municipality of Rúa, A (Ourense) has a total of 1 active public charging stations, with 2 dedicated charging bays and 2 connectors in service. Maximum power output reaches 100 kW, with 2 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Rúa, A

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
1
Physical locations
Charging Points
2
Dedicated bays
Active Plugs
2
Operational outlets
Fast Charging
2
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
100 kW
Peak recorded

Available Connectors in Rúa, A

Charging connectors by type in Rúa, A
Connector TypeActive Plugs
CCS Combo 22 plugs

Power Distribution in Rúa, A

Charging plugs distribution by power in Rúa, A
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)2 plugs
Semi-fast (7.4 to 22 kW)0 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Rúa, A

1 stations mapped

Interactive EV Charging Map

1 charging stations ready to explore

All EV Charging Locations in Rúa, A

Verified specs, connector types and speeds from the official ministry registry

100 kW(Fast)✓ Cable24/7

Petrol Station A Rúa

Rúa Campo Grande, 59
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2
2 points • 2 plugs
Details

Frequently Asked Questions in Rúa, A

How many public EV charging points are there in Rúa, A?

Rúa, A currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 2 operational charging plugs.

Are fast charging stations available in Rúa, A?

Yes, Rúa, A features 2 fast and ultra-fast charging plugs (≥43 kW up to 100 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Rúa, A?

Public charging infrastructure in Rúa, A is mainly operated by WENEA EMOBILITY SERVICES S.L., among other regional networks.

Closest Neighboring Towns to Rúa, A with EV Chargers

Physical proximity calculated via GPS Haversine distance from Rúa, A

All towns in Ourense
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.