50 kW• Fast🏨Hotel / Alojamiento24/7Active in MITECO registry

Miranda de Ebro - Hotel Tudanca

Carretera Nacional I, Km 318, Miranda de Ebro (09200), Burgos, Spain
Network Operator(ZUNDER) Grupo Easychargar SA
Total Capacity5 bays (5 plugs)
GPS Coordinates42.68858, -2.95347
Official ID2023004074
Official Registry DateOct 13, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Miranda de Ebro, belonging to the province of Burgos (Castilla y León, Spain). The charging equipment and commercial operation belong to the (ZUNDER) Grupo Easychargar SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:63 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023004074
Post / EVSE Identifier #1COD20230000015368PR00004302
Post / EVSE Identifier #2ES*ZUN*E0902ER1
Post / EVSE Identifier #371
Post / EVSE Identifier #4COD20230000015369PR00004303
Post / EVSE Identifier #5ES*ZUN*E0902ER2
Post / EVSE Identifier #670
Post / EVSE Identifier #7COD20230000015370PR00004304
Post / EVSE Identifier #8ES*ZUN*E0902ER3
Post / EVSE Identifier #953
Post / EVSE Identifier #10COD20230000015371PR00004305
Post / EVSE Identifier #11ES*ZUN*E0902ER4
Post / EVSE Identifier #1254
Post / EVSE Identifier #13COD20230000015372PR00004306
Post / EVSE Identifier #14ES*ZUN*E0902EV1
Post / EVSE Identifier #1572

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.688583 | Lon: -2.953472View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.