7.4 kW• Semi-fast🏨Hotel / Alojamiento24/7Active in MITECO registry

Hotel Melia Bilbao

Leizaola Lehendakariaren Kalea, 29, Bilbao (48001), Bizkaia, Spain
Network OperatorWENEA EMOBILITY SERVICES S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates43.26750, -2.94183
Official ID2024004082
Official Registry DateJun 12, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Bilbao, belonging to the province of Bizkaia (País Vasco, Spain). The charging equipment and commercial operation belong to the WENEA EMOBILITY SERVICES S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004082
Post / EVSE Identifier #1COD20240000034014PR00010206
Post / EVSE Identifier #2ES*WEN*EMELIABILBAO21
Post / EVSE Identifier #3fff9b2a2-ab43-9762-c98e-ae4f60077610
Post / EVSE Identifier #4COD20240000034015PR00010207
Post / EVSE Identifier #5ES*WEN*EMELIABILBAO11
Post / EVSE Identifier #6f4124416-0ceb-5bf6-2bdb-2841105e33de

Theoretical Charging Times at Maximum Power (7.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 42 min(~2.7 hours)
40 kWh Battery~5 h 24 min(~5.4 hours)
60 kWh Battery~8 h 6 min(~8.1 hours)
80 kWh Battery~10 h 49 min(~10.8 hours)

Opening Hours

Jueves (00:00 - 23:59) Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Domingo (00:00 - 23:59) Sabado (00:00 - 23:59) Viernes (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.267499 | Lon: -2.941832View on OpenStreetMap →

Other Nearby Charging Stations

150 kW(Ultra-fast)
690 m away

BI-Bilbao-012

Abandoibarra,2
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
22 kW(Semi-fast)
1.1 km away

BI-Bilbao-007

Uribitarte,10
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
8 points • 8 plugs
Details
7 kW(Standard)
1.4 km away

BI-Bilbao-008

Benidorm,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.