7 kW• StandardHorario habitualActive in MITECO registry

BI-Bilbao-008

Benidorm,2, Bilbao (48015), Bizkaia, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates43.27419, -2.95725
Official ID2024001060
Official Registry DateFeb 20, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Bilbao, belonging to the province of Bizkaia (País Vasco, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024001060
Post / EVSE Identifier #1COD20240000023215PR00003158
Post / EVSE Identifier #2ES*IBD*E12878
Post / EVSE Identifier #313478
Post / EVSE Identifier #4COD20240000023216PR00003159
Post / EVSE Identifier #5ES*IBD*E12879
Post / EVSE Identifier #613479
Post / EVSE Identifier #7COD20240000023217PR00003160
Post / EVSE Identifier #8ES*IBD*E12894
Post / EVSE Identifier #913494
Post / EVSE Identifier #10COD20240000023218PR00003161
Post / EVSE Identifier #11ES*IBD*E12895
Post / EVSE Identifier #1213495
Post / EVSE Identifier #13COD20240000023219PR00003162
Post / EVSE Identifier #14ES*IBD*E12898
Post / EVSE Identifier #1513498
Post / EVSE Identifier #16COD20240000023220PR00003163
Post / EVSE Identifier #17ES*IBD*E12899
Post / EVSE Identifier #1813499

Theoretical Charging Times at Maximum Power (7 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 51 min(~2.9 hours)
40 kWh Battery~5 h 43 min(~5.7 hours)
60 kWh Battery~8 h 34 min(~8.6 hours)
80 kWh Battery~11 h 26 min(~11.4 hours)

Opening Hours

Miercoles (09:30 - 21:30) Martes (09:30 - 21:30) Lunes (09:30 - 21:30) Viernes (09:30 - 21:30) Sabado (09:30 - 21:30) Jueves (09:30 - 21:30) Domingo (00:00 - 00:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.274189 | Lon: -2.957254View on OpenStreetMap →

Other Nearby Charging Stations

150 kW(Ultra-fast)
2.0 km away

BI-Bilbao-012

Abandoibarra,2
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
22 kW(Semi-fast)
2.5 km away

BI-Bilbao-007

Uribitarte,10
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
8 points • 8 plugs
Details
22 kW(Semi-fast)🏬Centro Comercial
6.8 km away

Centro Comercial Ballonti

Av. Ballonti, 1, 48920 Portugalete, Vizcaya,
Operator:Punto Recargas SL
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.