7.4 kW• Semi-fastHorario habitualActive in MITECO registry

E-BI-Barakaldo-001

La Ribera,3, Barakaldo (48902), Bizkaia, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (4 plugs)
GPS Coordinates43.29188, -3.00667
Official ID2023004050
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Barakaldo, belonging to the province of Bizkaia (País Vasco, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Schuko (Enchufe doméstico)
2.3 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:10 A
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
2 connectors available
Schuko (Enchufe doméstico)
2.3 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:10 A
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023004050
Post / EVSE Identifier #1COD20230000015310PR00004234
Post / EVSE Identifier #2ES*IBD*E5288
Post / EVSE Identifier #35477
Post / EVSE Identifier #45478
Post / EVSE Identifier #5COD20230000015313PR00004237
Post / EVSE Identifier #6ES*IBD*E5291
Post / EVSE Identifier #75483
Post / EVSE Identifier #85484

Theoretical Charging Times at Maximum Power (7.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 42 min(~2.7 hours)
40 kWh Battery~5 h 24 min(~5.4 hours)
60 kWh Battery~8 h 6 min(~8.1 hours)
80 kWh Battery~10 h 49 min(~10.8 hours)

Opening Hours

Lunes (10:00 - 22:00) Miercoles (10:00 - 22:00) Viernes (10:00 - 22:00) Sabado (10:00 - 22:00) Jueves (10:00 - 22:00) Martes (10:00 - 22:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.291876 | Lon: -3.006671View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
2.5 km away

BI-Trapaga-002

Juan Sebastian Elkano,15
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
7 kW(Standard)
4.5 km away

BI-Bilbao-008

Benidorm,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
22 kW(Semi-fast)
4.9 km away

BI-Santurtzi-001

Puerto Pesquero,9
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.