360 kW• Ultra-fast24/7Active in MITECO registry

Clun Ribadeo (Os Irmandiños)

A Preixoana,S/N, Ribadeo (27796), Lugo, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity8 bays (10 plugs)
GPS Coordinates43.54567, -7.15622
Official IDBHU6CJTFYCUULBFFCG5M
Official Registry DateSep 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ribadeo, belonging to the province of Lugo (Galicia, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V360 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:500 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V360 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:500 A
3Charging Bay #3
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:300 A
4Charging Bay #4
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:300 A
5Charging Bay #5
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:300 A
6Charging Bay #6
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:300 A
7Charging Bay #7
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:300 A
8Charging Bay #8
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:300 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeBHU6CJTFYCUULBFFCG5M
Post / EVSE Identifier #1WULXDKJXSL9CIF9TSPSGDCCD7EX
Post / EVSE Identifier #2ES*FCT*E230972
Post / EVSE Identifier #3243203
Post / EVSE Identifier #4MJBBWRQ9KUGY4DNFHHMX9HSV1KA
Post / EVSE Identifier #5ES*FCT*E230973
Post / EVSE Identifier #6243204
Post / EVSE Identifier #7NPTJYRAW9DRCOZ7LAY6MFA7JLJA
Post / EVSE Identifier #8ES*FCT*E230974
Post / EVSE Identifier #9243206
Post / EVSE Identifier #10243205
Post / EVSE Identifier #11ZL2EVR5LQ3EXZKDKZZHANOZOEWS
Post / EVSE Identifier #12ES*FCT*E230975
Post / EVSE Identifier #13243208
Post / EVSE Identifier #14243207
Post / EVSE Identifier #15A7O4DAASS7SLOEIGU2LNA0G83IT
Post / EVSE Identifier #16ES*FCT*E230976
Post / EVSE Identifier #17243209
Post / EVSE Identifier #18DZM4Z80RR8YWHIC96CBQXWMKLFW
Post / EVSE Identifier #19ES*FCT*E230977
Post / EVSE Identifier #20243210
Post / EVSE Identifier #21GUH4QF4L3YXXGVOGKT9NQYJPPJO
Post / EVSE Identifier #22ES*FCT*E230978
Post / EVSE Identifier #23243211
Post / EVSE Identifier #24YETQFAWHPOOM8TCCE3FFDR1TTPK
Post / EVSE Identifier #25ES*FCT*E230979
Post / EVSE Identifier #26243212

Theoretical Charging Times at Maximum Power (360 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~3 min(~0.1 hours)
40 kWh Battery~7 min(~0.1 hours)
60 kWh Battery~10 min(~0.2 hours)
80 kWh Battery~13 min(~0.2 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.545674 | Lon: -7.15622View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
6.1 km away

Rest. El Huerto

Villaframil, 2
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.