100 kW• Fast24/7Active in MITECO registry

Burger King - Ribadeo

Da Ria De Ribadeo,44, Ribadeo (27710), Lugo, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (3 plugs)
GPS Coordinates43.54061, -7.06516
Official ID8FYERKZGM6GXUVHPG3OI
Official Registry DateMay 27, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ribadeo, belonging to the province of Lugo (Galicia, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
2Charging Bay #2
2 connectors available
CHAdeMO
80 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:200 A
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code8FYERKZGM6GXUVHPG3OI
Post / EVSE Identifier #15BU1QWI9KLBNEMYJJ4GZW2IHRRE
Post / EVSE Identifier #2ES*FCT*E230084
Post / EVSE Identifier #3242216
Post / EVSE Identifier #4JYF6HVF6J2B4TMBWHYGGQYTBFYE
Post / EVSE Identifier #5ES*FCT*E230085
Post / EVSE Identifier #6242217
Post / EVSE Identifier #7242218

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.540608 | Lon: -7.065159View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
1.3 km away

Rest. El Huerto

Villaframil, 2
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
7.4 kW(Semi-fast)
3.1 km away

Castropol - Muelle

Paseo Del Muelle 13
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.