100 kW• Fast24/7Active in MITECO registry

ACCIONA - Ayuntamiento de Xove

Camino Real, 22, Xove (27870), Lugo, Spain
Network OperatorACCIONA Recarga
Total Capacity2 bays (2 plugs)
GPS Coordinates43.68573, -7.50886
Official ID2024004454
Official Registry DateJun 21, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Xove, belonging to the province of Lugo (Galicia, Spain). The charging equipment and commercial operation belong to the ACCIONA Recarga network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:250 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004454
Post / EVSE Identifier #1COD20240000036563PR00011698
Post / EVSE Identifier #2ES*ARE*EDZ6INH7PL93XUWLD6TI6
Post / EVSE Identifier #35b9247e28636fa39f4adb810
Post / EVSE Identifier #4COD20240000036564PR00011699
Post / EVSE Identifier #5ES*ARE*EVMCSETM0COX8L1OZ2NZW

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Domingo (00:00 - 23:59) Viernes (00:00 - 23:59) Sabado (00:00 - 23:59) Lunes (00:00 - 23:59) Jueves (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN

Accessibility & Amenities

Standard public access. Additional amenities: RESTAURANTE

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.6857263 | Lon: -7.5088558View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
5.5 km away

62121015980005

Lugar O Cruceiro, Viveiro, Lugo, Spain
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
100 kW(Fast)🏨Hotel / Alojamiento
8.5 km away

Hotel Las Sirenas

Playa De Sacido, S/N
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
50 kW(Fast)🛒Eroski
13.6 km away

EROSKI BURELA

Lugar, Av. do Perdouro,13
Operator:ENERGEA CONSULTING Y ASESORES SL
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.