50 kW• Fast🛒EroskiHorario habitualActive in MITECO registry

EROSKI BURELA

Lugar, Av. do Perdouro,13, Burela (27880), Lugo, Spain
Network OperatorENERGEA CONSULTING Y ASESORES SL
Total Capacity1 bay (3 plugs)
GPS Coordinates43.64625, -7.34954
Official ID2024001768
Official Registry DateMar 04, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Burela, belonging to the province of Lugo (Galicia, Spain). The charging equipment and commercial operation belong to the ENERGEA CONSULTING Y ASESORES SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
Tipo 2 (Mennekes)
18 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:63 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024001768
Post / EVSE Identifier #1COD20240000024309PR00004251
Post / EVSE Identifier #2ES*ENE*E034
Post / EVSE Identifier #3C01
Post / EVSE Identifier #4C02
Post / EVSE Identifier #5C03

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Martes (09:15 - 21:45) Lunes (09:15 - 21:45) Viernes (09:15 - 21:45) Miercoles (09:15 - 21:45) Jueves (09:15 - 21:45) Sabado (09:15 - 21:45) Domingo (00:00 - 00:00)

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Accessibility: SI. Additional amenities: APARCAMIENTO, SUPERMERCADO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.6462474 | Lon: -7.34953587View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
8.2 km away

CASH RECORD FOZ

Parque empresarial Foz, Parcela 83
Operator:ENERGEA CONSULTING Y ASESORES SL
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
50 kW(Fast)⛽Estación Repsol
10.1 km away

Repsol ES, CRED Foz

Av. Viveiro, 92
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
22 kW(Semi-fast)
11.3 km away

E-LU-Foz(santiago)-001

Alvaro Cunqueiro,60
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.