EV Charging Stations in Peñausende (Zamora)

How many EV charging points are there in Peñausende?

As of 24/10/2026, the municipality of Peñausende (Zamora) has a total of 1 active public charging stations, with 2 dedicated charging bays and 2 connectors in service. Maximum power output reaches 100 kW, with 2 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Peñausende

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
1
Physical locations
Charging Points
2
Dedicated bays
Active Plugs
2
Operational outlets
Fast Charging
2
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
100 kW
Peak recorded

Available Connectors in Peñausende

Charging connectors by type in Peñausende
Connector TypeActive Plugs
CCS Combo 22 plugs
Operators in Peñausende:

Power Distribution in Peñausende

Charging plugs distribution by power in Peñausende
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)2 plugs
Semi-fast (7.4 to 22 kW)0 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Peñausende

1 stations mapped

Interactive EV Charging Map

1 charging stations ready to explore

All EV Charging Locations in Peñausende

Verified specs, connector types and speeds from the official ministry registry

100 kW(Fast)⚡ 800V✓ Cable🏨Hotel / Alojamiento24/7

ACCIONA - Hotel la Becera

Calle Cortina Larga, 3
Operator:ACCIONA Recarga
CCS Combo 2
2 points • 2 plugs
Details

Frequently Asked Questions in Peñausende

How many public EV charging points are there in Peñausende?

Peñausende currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 2 operational charging plugs.

Are fast charging stations available in Peñausende?

Yes, Peñausende features 2 fast and ultra-fast charging plugs (≥43 kW up to 100 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Peñausende?

Public charging infrastructure in Peñausende is mainly operated by ACCIONA Recarga, among other regional networks.

Closest Neighboring Towns to Peñausende with EV Chargers

Physical proximity calculated via GPS Haversine distance from Peñausende

All towns in Zamora
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.