EV Charging Stations in Benavente (Zamora)
As of 24/10/2026, the municipality of Benavente (Zamora) has a total of 9 active public charging stations, with 37 dedicated charging bays and 42 connectors in service. Maximum power output reaches 400 kW, with 34 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Benavente
Official consolidated metrics from the public MITECO registry
- Stations
- 9 Physical locations
- Charging Points
- 37 Dedicated bays
- Active Plugs
- 42 Operational outlets
- Fast Charging
- 5 ≥ 43 kW
- Ultra-Fast
- 29 ≥ 150 kW
- Max Power
- 400 kW Peak recorded
Available Connectors in Benavente
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 7 plugs |
| CHAdeMO | 3 plugs |
| CCS Combo 2 | 30 plugs |
| Schuko (Enchufe doméstico) | 2 plugs |
Power Distribution in Benavente
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 29 plugs |
| Fast (43 to 149 kW) | 5 plugs |
| Semi-fast (7.4 to 22 kW) | 6 plugs |
| Standard (< 7.4 kW) | 2 plugs |
EV Charging Stations Map in Benavente
9 stations mappedInteractive EV Charging Map
9 charging stations ready to explore
All EV Charging Locations in Benavente
Verified specs, connector types and speeds from the official ministry registry
Benavente
BENAVENTE (BARRIO DE LAS ERAS)
BENAVENTE (AVD. EL FERIAL)
ZA-BENAVENTE-001-3
E-ZA-Benavente-001
Repsol ES, CRED Benavente
Estación Valcarce Benavente by Porsche
Frequently Asked Questions in Benavente
How many public EV charging points are there in Benavente?
Benavente currently has 9 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 42 operational charging plugs.
Are fast charging stations available in Benavente?
Yes, Benavente features 34 fast and ultra-fast charging plugs (≥43 kW up to 400 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Benavente?
Public charging infrastructure in Benavente is mainly operated by IBERDROLA CLIENTES S.A.U, FENIE ENERGIA, SA, Tesla Spain SLU, among other regional networks.
Closest Neighboring Towns to Benavente with EV Chargers
Physical proximity calculated via GPS Haversine distance from Benavente
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.