EV Charging Stations in Buñol (Valencia/València)
As of 24/10/2026, the municipality of Buñol (Valencia/València) has a total of 4 active public charging stations, with 10 dedicated charging bays and 12 connectors in service. Maximum power output reaches 60 kW, with 8 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Buñol
Official consolidated metrics from the public MITECO registry
- Stations
- 4 Physical locations
- Charging Points
- 10 Dedicated bays
- Active Plugs
- 12 Operational outlets
- Fast Charging
- 8 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 60 kW Peak recorded
Available Connectors in Buñol
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 6 plugs |
| CHAdeMO | 2 plugs |
| CCS Combo 2 | 4 plugs |
Power Distribution in Buñol
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 8 plugs |
| Semi-fast (7.4 to 22 kW) | 4 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Buñol
4 stations mappedInteractive EV Charging Map
4 charging stations ready to explore
All EV Charging Locations in Buñol
Verified specs, connector types and speeds from the official ministry registry
20XM32T8KK4AR00022
C6E06BCC21QRPYHBAK
Repsol ES, ALZ BUÑOL
Frequently Asked Questions in Buñol
How many public EV charging points are there in Buñol?
Buñol currently has 4 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 12 operational charging plugs.
Are fast charging stations available in Buñol?
Yes, Buñol features 8 fast and ultra-fast charging plugs (≥43 kW up to 60 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Buñol?
Public charging infrastructure in Buñol is mainly operated by ENDESA X WAY, S.L., IBERDROLA CLIENTES S.A.U, REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.
Closest Neighboring Towns to Buñol with EV Chargers
Physical proximity calculated via GPS Haversine distance from Buñol
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.