EV Charging Stations in Eliana, l' (Valencia/València)

How many EV charging points are there in Eliana, l'?

As of 24/10/2026, the municipality of Eliana, l' (Valencia/València) has a total of 13 active public charging stations, with 37 dedicated charging bays and 49 connectors in service. Maximum power output reaches 120 kW, with 34 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Eliana, l'

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
13
Physical locations
Charging Points
37
Dedicated bays
Active Plugs
49
Operational outlets
Fast Charging
34
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
120 kW
Peak recorded

Available Connectors in Eliana, l'

Charging connectors by type in Eliana, l'
Connector TypeActive Plugs
CCS Combo 224 plugs
Tipo 2 (Mennekes)18 plugs
CHAdeMO7 plugs

Power Distribution in Eliana, l'

Charging plugs distribution by power in Eliana, l'
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)34 plugs
Semi-fast (7.4 to 22 kW)15 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Eliana, l'

13 stations mapped

Interactive EV Charging Map

13 charging stations ready to explore

All EV Charging Locations in Eliana, l'

Verified specs, connector types and speeds from the official ministry registry

100 kW(Fast)⚡ 800V✓ Cable24/7

V-ELIANA-006

Molino,29
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
120 kW(Fast)⚡ 800V✓ Cable24/7

Polideportivo ELIANA 120

Camp De Turia,21
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2Tipo 2 (Mennekes)
4 points • 4 plugs
Details
100 kW(Fast)⚡ 800V✓ Cable24/7

V-ELIANA-007

Begoña,1
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
120 kW(Fast)⚡ 800V✓ Cable🅿️Parking24/7

Aparcamiento Poliesportiu

Poliesportiu,1A
Operator:CHARGING TOGETHER SL
Tipo 2 (Mennekes)CCS Combo 2
4 points • 4 plugs
Details
7.4 kW(Semi-fast)✓ Cable24/7

V-ELIANA-008

Tuejar,37
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
50 kW(Fast)✓ Cable24/7

V-LEliana-003

Tuejar,37
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
4 points • 6 plugs
Details
100 kW(Fast)⚡ 800V✓ Cable24/7

Popeyes - La Pobla

Valencia Ademuz,1H
Operator:CHARGING TOGETHER SL
CCS Combo 2
2 points • 2 plugs
Details
120 kW(Fast)⚡ 800V✓ Cable🛒Supermercado ConsumHorario habitual

Consum - L'Eliana

Alcalde Enrique Daries,14
Operator:CHARGING TOGETHER SL
CCS Combo 2CHAdeMO
4 points • 5 plugs
Details
22.17 kW(Semi-fast)🛒Supermercado Mercadona24/7

Mercadona, Carr. Ribarroja

Carr. Ribarroja, Km6
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)
3 points • 4 plugs
Details
50 kW(Fast)✓ Cable⛽Estación Repsol24/7

Repsol ES, CRED La Eliana

Av. Camp Del Túria, 70
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
3 points • 9 plugs
Details
50 kW(Fast)✓ Cable⛽Estación Repsol24/7

Repsol ES, INTER-ALFARA S.A.

Vv-6104 Km. 6,00 I
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details

Frequently Asked Questions in Eliana, l'

How many public EV charging points are there in Eliana, l'?

Eliana, l' currently has 13 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 49 operational charging plugs.

Are fast charging stations available in Eliana, l'?

Yes, Eliana, l' features 34 fast and ultra-fast charging plugs (≥43 kW up to 120 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Eliana, l'?

Public charging infrastructure in Eliana, l' is mainly operated by IBERDROLA CLIENTES S.A.U, CHARGING TOGETHER SL, REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.

Closest Neighboring Towns to Eliana, l' with EV Chargers

Physical proximity calculated via GPS Haversine distance from Eliana, l'

All towns in Valencia/València
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.