EV Charging Stations in Llerena (Badajoz)

How many EV charging points are there in Llerena?

As of 24/10/2026, the municipality of Llerena (Badajoz) has a total of 1 active public charging stations, with 3 dedicated charging bays and 3 connectors in service. Maximum power output reaches 50 kW, with 2 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Llerena

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
1
Physical locations
Charging Points
3
Dedicated bays
Active Plugs
3
Operational outlets
Fast Charging
2
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
50 kW
Peak recorded

Available Connectors in Llerena

Charging connectors by type in Llerena
Connector TypeActive Plugs
Tipo 2 (Mennekes)1 plug
CHAdeMO1 plug
CCS Combo 21 plug

Power Distribution in Llerena

Charging plugs distribution by power in Llerena
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)2 plugs
Semi-fast (7.4 to 22 kW)1 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Llerena

1 stations mapped

Interactive EV Charging Map

1 charging stations ready to explore

All EV Charging Locations in Llerena

Verified specs, connector types and speeds from the official ministry registry

50 kW(Fast)✓ Cable24/7

DIPBA Llerena

Calle Portillo De Frasco Vaca, S/N
Operator:WENEA EMOBILITY SERVICES S.L.
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
3 points • 3 plugs
Details

Frequently Asked Questions in Llerena

How many public EV charging points are there in Llerena?

Llerena currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 3 operational charging plugs.

Are fast charging stations available in Llerena?

Yes, Llerena features 2 fast and ultra-fast charging plugs (≥43 kW up to 50 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Llerena?

Public charging infrastructure in Llerena is mainly operated by WENEA EMOBILITY SERVICES S.L., among other regional networks.

Closest Neighboring Towns to Llerena with EV Chargers

Physical proximity calculated via GPS Haversine distance from Llerena

All towns in Badajoz
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.