EV Charging Stations in Azuaga (Badajoz)

How many EV charging points are there in Azuaga?

As of 24/10/2026, the municipality of Azuaga (Badajoz) has a total of 3 active public charging stations, with 9 dedicated charging bays and 13 connectors in service. Maximum power output reaches 50 kW, with 9 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Azuaga

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
3
Physical locations
Charging Points
9
Dedicated bays
Active Plugs
13
Operational outlets
Fast Charging
9
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
50 kW
Peak recorded

Available Connectors in Azuaga

Charging connectors by type in Azuaga
Connector TypeActive Plugs
Tipo 2 (Mennekes)7 plugs
CHAdeMO3 plugs
CCS Combo 23 plugs

Power Distribution in Azuaga

Charging plugs distribution by power in Azuaga
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)9 plugs
Semi-fast (7.4 to 22 kW)4 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Azuaga

3 stations mapped

Interactive EV Charging Map

3 charging stations ready to explore

All EV Charging Locations in Azuaga

Verified specs, connector types and speeds from the official ministry registry

50 kW(Fast)✓ Cable24/7

BA-Azuaga-001

Nacional,142
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
4 points • 6 plugs
Details

Frequently Asked Questions in Azuaga

How many public EV charging points are there in Azuaga?

Azuaga currently has 3 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 13 operational charging plugs.

Are fast charging stations available in Azuaga?

Yes, Azuaga features 9 fast and ultra-fast charging plugs (≥43 kW up to 50 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Azuaga?

Public charging infrastructure in Azuaga is mainly operated by REPSOL SOLUCIONES ENERGÉTICAS SA, IBERDROLA CLIENTES S.A.U, among other regional networks.

Closest Neighboring Towns to Azuaga with EV Chargers

Physical proximity calculated via GPS Haversine distance from Azuaga

All towns in Badajoz
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.