50 kW• Fast24/7Active in MITECO registry

ZUNDER - Lasarte

A1 Arrapide Pasealekua, Avda Del Hipódromo, Donostia/San Sebastián (20160), Gipuzkoa, Spain
Network Operator(ZUNDER) Grupo Easychargar SA
Total Capacity6 bays (6 plugs)
GPS Coordinates43.25435, -2.02299
Official ID2023004090
Official Registry DateOct 13, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Donostia/San Sebastián, belonging to the province of Gipuzkoa (País Vasco, Spain). The charging equipment and commercial operation belong to the (ZUNDER) Grupo Easychargar SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
4Charging Bay #4
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
5Charging Bay #5
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
6Charging Bay #6
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023004090
Post / EVSE Identifier #1COD20230000015447PR00004381
Post / EVSE Identifier #2ES*ZUN*E2001ER1
Post / EVSE Identifier #3280
Post / EVSE Identifier #4COD20230000015448PR00004382
Post / EVSE Identifier #5ES*ZUN*E2001ER2
Post / EVSE Identifier #6281
Post / EVSE Identifier #7COD20230000015449PR00004383
Post / EVSE Identifier #8ES*ZUN*E2001ER3
Post / EVSE Identifier #9282
Post / EVSE Identifier #10COD20230000015450PR00004384
Post / EVSE Identifier #11ES*ZUN*E2001EV3
Post / EVSE Identifier #12283
Post / EVSE Identifier #13COD20230000015451PR00004385
Post / EVSE Identifier #14ES*ZUN*E2001ER4
Post / EVSE Identifier #15286
Post / EVSE Identifier #16COD20230000015452PR00004386
Post / EVSE Identifier #17ES*ZUN*E2001EV4
Post / EVSE Identifier #18287

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.254352 | Lon: -2.022994View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)🏬Centro Comercial
2.4 km away

ACCIONA - C.C. Urbil 01

Barrio Txiki-Erdi, 7
Operator:ACCIONA Recarga
CCS Combo 2Tipo 2 (Mennekes)
6 points • 6 plugs
Details
50 kW(Fast)🏬Centro Comercial
2.4 km away

ACCIONA - C.C. Urbil 02

Barrio Txiki-Erdi, 7
Operator:ACCIONA Recarga
CHAdeMOTipo 2 (Mennekes)CCS Combo 2
13 points • 13 plugs
Details
150 kW(Ultra-fast)
3.3 km away

SS-ANDOAIN-001

Illarramendi,903
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.