7.4 kW• Semi-fast🅿️Parking24/7Active in MITECO registry

Zona BCN (Parking MX)

Traversera De Gracia, 316, Horta-Guinardo, 08025, Barcelona, Barcelona (08025), Barcelona, Spain
Network OperatorELECSUM FOTOVOLTAICA, S.L.U.
Total Capacity3 bays (3 plugs)
GPS Coordinates41.40786, 2.16854
Official IDPO0IE86TEN3WQIQM4P5X
Official Registry DateJun 05, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Barcelona, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the ELECSUM FOTOVOLTAICA, S.L.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodePO0IE86TEN3WQIQM4P5X
Post / EVSE Identifier #1PBUGUQSNUXRZPDMGRPUGQLQEX8W
Post / EVSE Identifier #2ES*EL5*EELE040101
Post / EVSE Identifier #3ELE0401-01
Post / EVSE Identifier #45JM2QXA4HX3ZQYAXSVLXYAPWNCI
Post / EVSE Identifier #5ES*EL5*EELE040102
Post / EVSE Identifier #6ELE0401-02
Post / EVSE Identifier #7TYXNXTFQL8ANAUSKGBYC0XQXM7I
Post / EVSE Identifier #8ES*EL5*EELE040103
Post / EVSE Identifier #9ELE0401-03

Theoretical Charging Times at Maximum Power (7.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 42 min(~2.7 hours)
40 kWh Battery~5 h 24 min(~5.4 hours)
60 kWh Battery~8 h 6 min(~8.1 hours)
80 kWh Battery~10 h 49 min(~10.8 hours)

Opening Hours

24/7

Supported Payment Methods

✓PAGO CON TARJETA DE DÉBITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.4078621 | Lon: 2.1685395View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.