180 kW• Ultra-fast24/7Active in MITECO registry

Vulcanizados Hoznayo Barros - Corrales de Buelna

Polígono Ind.De Barros,Parcela 32, Corrales de Buelna, Los (39408), Cantabria, Spain
Network Operator(ZUNDER) Grupo Easychargar SA
Total Capacity2 bays (2 plugs)
GPS Coordinates43.28525, -4.07677
Official ID2023004125
Official Registry DateOct 13, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Corrales de Buelna, Los, belonging to the province of Cantabria (Cantabria, Spain). The charging equipment and commercial operation belong to the (ZUNDER) Grupo Easychargar SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:500 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:500 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023004125
Post / EVSE Identifier #1COD20230000015624PR00004558
Post / EVSE Identifier #2ES*ZUN*E3903ER1
Post / EVSE Identifier #37140
Post / EVSE Identifier #4COD20230000015625PR00004559
Post / EVSE Identifier #5ES*ZUN*E3903ER2
Post / EVSE Identifier #67141

Theoretical Charging Times at Maximum Power (180 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~7 min(~0.1 hours)
40 kWh Battery~13 min(~0.2 hours)
60 kWh Battery~20 min(~0.3 hours)
80 kWh Battery~27 min(~0.4 hours)

Opening Hours

24/7

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access. Additional amenities: CAFETERÍA

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.285251 | Lon: -4.076768View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
2.9 km away

CAMPO 10

Campoo,10
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
60 kW(Fast)
5.4 km away

US_222_Cartes

Poblado Santiago De Cartes
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.