100 kW• Fast24/7Active in MITECO registry

Villamediana de Iregua - C. Anastasio Mateo 39

Anastasio Mateo ,39, Villamediana de Iregua (26142), Rioja, La, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (2 plugs)
GPS Coordinates42.43064, -2.41777
Official IDARZEJ6LQWJ134B385V2T
Official Registry DateMar 31, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Villamediana de Iregua, belonging to the province of Rioja, La (Rioja, La, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:600 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:600 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeARZEJ6LQWJ134B385V2T
Post / EVSE Identifier #1OGTEBCRAQOEZZDLJ8CYWVXBTHTL
Post / EVSE Identifier #2ES*FCT*E227664
Post / EVSE Identifier #3239600
Post / EVSE Identifier #4WGDBQMKGHRPURFQ8OQLXLESDFAB
Post / EVSE Identifier #5ES*FCT*E227665
Post / EVSE Identifier #6239601

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.43064 | Lon: -2.417773View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)🏨Hotel / Alojamiento
3.5 km away

Hostal Mesón Pepa

Av. Aragón, 9
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
100 kW(Fast)🏬Centro Comercial
3.6 km away

ACCIONA - C.C. Berceo

Calle Lérida, 1
Operator:ACCIONA Recarga
CCS Combo 2Tipo 2 (Mennekes)
17 points • 17 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.