22 kW• Semi-fast24/7Active in MITECO registry

VILLADIEGO

Plaza Mayor, 2, Villadiego (09120), Burgos, Spain
Network OperatorFENIE ENERGIA, SA
Total Capacity1 bay (4 plugs)
GPS Coordinates42.51601, -4.00981
Official ID2024007484
Official Registry DateDec 13, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Villadiego, belonging to the province of Burgos (Castilla y León, Spain). The charging equipment and commercial operation belong to the FENIE ENERGIA, SA network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
4 connectors available
Schuko Francés (Tipo E)
2.3 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:10 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Schuko Francés (Tipo E)
2.3 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:10 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024007484
Post / EVSE Identifier #1COD20240000047522PR00019322
Post / EVSE Identifier #2ES*FEN*E*0147
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #53
Post / EVSE Identifier #64

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
📅Advance slot reservation supported
🔓Remote plug unlock supported

Accessibility & Amenities

Accessibility: NO. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.516006 | Lon: -4.00981View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)⛽Estación Repsol
13.2 km away

Repsol ES, GASOLMILLOS

N-120, 144
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
150 kW(Ultra-fast)⛽Estación Repsol
21.5 km away

Repsol ES, Valle De Úrbel

A-231, Pk 152
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.