180 kW• Ultra-fast24/7Active in MITECO registry

VI-Vitoria-010

Portal De Foronda,0, Vitoria-Gasteiz (01010), Araba/Álava, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity10 bays (10 plugs)
GPS Coordinates42.86117, -2.68208
Official ID2024000481
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Vitoria-Gasteiz, belonging to the province of Araba/Álava (País Vasco, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:600 A
6Charging Bay #6
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:600 A
7Charging Bay #7
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:600 A
8Charging Bay #8
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:600 A
9Charging Bay #9
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:600 A
10Charging Bay #10
1 connector available
CCS Combo 2
⚡ 800V180 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:600 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000481
Post / EVSE Identifier #1COD20240000018700PR00001415
Post / EVSE Identifier #2ES*IBD*E221073
Post / EVSE Identifier #3232991
Post / EVSE Identifier #4COD20240000018701PR00001416
Post / EVSE Identifier #5ES*IBD*E221074
Post / EVSE Identifier #6232992
Post / EVSE Identifier #7COD20240000018702PR00001417
Post / EVSE Identifier #8ES*IBD*E221075
Post / EVSE Identifier #9232993
Post / EVSE Identifier #10COD20240000018703PR00001418
Post / EVSE Identifier #11ES*IBD*E221076
Post / EVSE Identifier #12232994
Post / EVSE Identifier #13COD20240000018704PR00001419
Post / EVSE Identifier #14ES*IBD*E221077
Post / EVSE Identifier #15232995
Post / EVSE Identifier #16COD20240000018705PR00001420
Post / EVSE Identifier #17ES*IBD*E221078
Post / EVSE Identifier #18232996
Post / EVSE Identifier #19COD20240000018706PR00001421
Post / EVSE Identifier #20ES*IBD*E221079
Post / EVSE Identifier #21232997
Post / EVSE Identifier #22COD20240000018707PR00001422
Post / EVSE Identifier #23ES*IBD*E221080
Post / EVSE Identifier #24232998
Post / EVSE Identifier #25COD20240000018708PR00001423
Post / EVSE Identifier #26ES*IBD*E221081
Post / EVSE Identifier #27232999
Post / EVSE Identifier #28COD20240000018709PR00001424
Post / EVSE Identifier #29ES*IBD*E221082
Post / EVSE Identifier #30233000

Theoretical Charging Times at Maximum Power (180 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~7 min(~0.1 hours)
40 kWh Battery~13 min(~0.2 hours)
60 kWh Battery~20 min(~0.3 hours)
80 kWh Battery~27 min(~0.4 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.86117 | Lon: -2.68208View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.