TotalEnergies - Rest. Los Rodriguez

Calle Real, 14, Calzadilla de los Barros (06249), Badajoz, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity3 bays (3 plugs)
GPS Coordinates38.30084, -6.31140
Official IDNL43KOZE6BUBGSW7KEOO
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Calzadilla de los Barros, belonging to the province of Badajoz (Extremadura, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeNL43KOZE6BUBGSW7KEOO
Post / EVSE Identifier #1YBBL1R4XVENPSOUOP6DC49GOTNG
Post / EVSE Identifier #2ES*TCB*E000683
Post / EVSE Identifier #31
Post / EVSE Identifier #44JEFWFREQ4LIAMVG3FVZ0BMO2XY
Post / EVSE Identifier #5ES*TCB*E000684
Post / EVSE Identifier #6PK5NMH94A2HI7LEXS7VW2GD0BTX
Post / EVSE Identifier #7ES*TCB*E000685

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.300842 | Lon: -6.311405View on OpenStreetMap →

Other Nearby Charging Stations

180 kW(Ultra-fast)
1.8 km away

C8A233S023JBGMTWZD-

A-66 Pk: 694, 06249 Badajoz, Extremadura, Spain
Operator:CEPSA COMERCIAL PETRÓLEO,S.A.U.
CCS Combo 2
1 point • 2 plugs
Details
22 kW(Semi-fast)
6.0 km away

DIPBA Fuente de Cantos

Calle Real, 29
Operator:WENEA EMOBILITY SERVICES S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)⛽Estación Repsol
6.1 km away

Repsol ES, Navarro

Carretera Nacional 630 Km 702,20
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.