TotalEnergies - Rest. Don Pepe

Ctra. N-525, Km 93, Mezquita, A (32548), Ourense, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates42.03794, -7.05463
Official IDAVLVH6KRXGVNVOQXLBH5
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Mezquita, A, belonging to the province of Ourense (Galicia, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
4Charging Bay #4
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeAVLVH6KRXGVNVOQXLBH5
Post / EVSE Identifier #12V1UEPJKESGB2LH1KVE0PGDHNAP
Post / EVSE Identifier #2ES*TCB*E000569
Post / EVSE Identifier #31
Post / EVSE Identifier #4R7SO3HOFPZGDDKWIWKEQC2FXDCN
Post / EVSE Identifier #5ES*TCB*E000570
Post / EVSE Identifier #68OYVNZQJIIR2PRLZEKAXZBU8USY
Post / EVSE Identifier #7ES*TCB*E000571
Post / EVSE Identifier #8UTT5LKTUKDSYN0M28WFSPE0IX46
Post / EVSE Identifier #9ES*TCB*E000572

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.03794 | Lon: -7.05463View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
10 m away

Rest. Don Pepe

Ctra. N-525, Km 93,
Operator:Wenea Services Spain, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)
16.7 km away

24XP22T3QQJAN01183

Mirador Da Ribeira - Rúa Santo Cristo, 12,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.