TotalEnergies - Rest. Ballestanea

Barrio Arkolla, 75, Hondarribia (20280), Gipuzkoa, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity3 bays (3 plugs)
GPS Coordinates43.35876, -1.80802
Official IDK7Y4OWX4Y8U4YXVSKRKV
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Hondarribia, belonging to the province of Gipuzkoa (País Vasco, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeK7Y4OWX4Y8U4YXVSKRKV
Post / EVSE Identifier #1WM15LF7DWCDOC7885KZNMV6PKDP
Post / EVSE Identifier #2ES*TCB*E000566
Post / EVSE Identifier #31
Post / EVSE Identifier #4K1P0NFN4ELNICXUXTCNWJKP0JXB
Post / EVSE Identifier #5ES*TCB*E000567
Post / EVSE Identifier #6W0IYOPD1EGINCF1OUIRGL5T1QNQ
Post / EVSE Identifier #7ES*TCB*E000568

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.35876 | Lon: -1.808024View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
10 m away

Rest. Ballestanea

Calle Arkolla Auzoa, 39
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2Tipo 2 (Mennekes)
3 points • 3 plugs
Details
7.4 kW(Semi-fast)
2.7 km away

SS-Irun-006

Elizatxo Hiribidea,9
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.