100 kW• Fast🏨Hotel / AlojamientoActive in MITECO registry

TotalEnergies - Hotel Vejo

Av. Cantabria, 83, Campoo de Enmedio (39200), Cantabria, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates43.00540, -4.13022
Official IDYDGKOHKGSJW1JR1HRNSU
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Campoo de Enmedio, belonging to the province of Cantabria (Cantabria, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
4Charging Bay #4
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeYDGKOHKGSJW1JR1HRNSU
Post / EVSE Identifier #1HRYHPO3TBAGXIQU21QL7SNAHGH2
Post / EVSE Identifier #2ES*TCB*E000546
Post / EVSE Identifier #31
Post / EVSE Identifier #4ZVUKYPCPRCT4UQYMUPQCUVJJQTG
Post / EVSE Identifier #5ES*TCB*E000547
Post / EVSE Identifier #6TXW1A6I5IBGOMYKIQNIR81LYHJG
Post / EVSE Identifier #7ES*TCB*E000548
Post / EVSE Identifier #8KWMIGWEYW6JW3AQK1SXEVG0DL5M
Post / EVSE Identifier #9ES*TCB*E000549

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.0054 | Lon: -4.130219View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
1.2 km away

E-S-Reinosa-001

La Vega,56
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)
1.2 km away

S-Reinosa-003

La Vega,56
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
4 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.