100 kW• Fast🏨Hotel / AlojamientoActive in MITECO registry

TotalEnergies - Hotel Rest. Casa Marzo

Arrabal Bajo, 1, Cariñena (50400), Zaragoza, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates41.34107, -1.22464
Official IDSZQ0XLGJ1ZLQOM6AGMGA
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cariñena, belonging to the province of Zaragoza (Aragón, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
3Charging Bay #3
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeSZQ0XLGJ1ZLQOM6AGMGA
Post / EVSE Identifier #1D4RAUFWVLIHSBLHXZFXXWKVWM5D
Post / EVSE Identifier #2ES*TCB*E001061
Post / EVSE Identifier #31
Post / EVSE Identifier #49BA8OCIGU21GJSLGHUTAVVITBYS
Post / EVSE Identifier #5ES*TCB*E001062
Post / EVSE Identifier #6EDDFRVSLI2J6MZLAYBFSCRSOVUG
Post / EVSE Identifier #7ES*TCB*E001063
Post / EVSE Identifier #8NZUG93LX3XAEIAVIL0KGBWOYLDB
Post / EVSE Identifier #9ES*TCB*E001064

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.341072 | Lon: -1.224639View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
360 m away

C6E06BCC22ZRBHDPPK

Pl. De Las Almas & C. Rda. Del Muro, 50400
Operator:ENDESA X WAY, S.L.
CCS Combo 2
2 points • 2 plugs
Details
21 kW(Semi-fast)
370 m away

22XP22T3KKJAK00954

Pl. De Las Almas & C. Rda. Del Muro, 50400
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)
710 m away

Z-Cariñena-003

Valencia,330
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.