150 kW• Ultra-fast🏨Hotel / AlojamientoActive in MITECO registry

TotalEnergies - Hotel Plazaola

Hotel Plazaola Aralar Kalea, 8, Irurtzun (31860), Navarra, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates42.91915, -1.83120
Official ID5MZ5QBSEACEWKDD3JMSH
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Irurtzun, belonging to the province of Navarra (Navarra, Comunidad Foral de, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
4Charging Bay #4
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code5MZ5QBSEACEWKDD3JMSH
Post / EVSE Identifier #1LLJPQ7K1ZPZZOVAADLAA2ELKB5C
Post / EVSE Identifier #2ES*TCB*E000882
Post / EVSE Identifier #31
Post / EVSE Identifier #4E5IVV8JSEDKP4TXEOEZ3JURVKEE
Post / EVSE Identifier #5ES*TCB*E000883
Post / EVSE Identifier #60ORRSICRRFX59OPJOWNLWSW2VZU
Post / EVSE Identifier #7ES*TCB*E000884
Post / EVSE Identifier #8IIPZAJ3FZWEBWWR6DZSSGNTDZOH
Post / EVSE Identifier #9ES*TCB*E000885

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.91915 | Lon: -1.8312View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
10.9 km away

NA-Lekunberri-002

Arzanegui,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CCS Combo 2
4 points • 4 plugs
Details
22 kW(Semi-fast)
11.4 km away

NA-Lekunberri-003

Pg Industrial S-P,0
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7 kW(Standard)
15.1 km away

NA-Orkoien-003

Euntzeandia,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.