50 kW• Fast🏨Hotel / AlojamientoActive in MITECO registry

TotalEnergies - Hotel Pazo de Bendoiro

Xubin, 1, Lalín (36512), Pontevedra, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates42.67936, -8.17541
Official IDCPNHVJU12XDDDGPOJEO3
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Lalín, belonging to the province of Pontevedra (Galicia, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:100 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:100 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeCPNHVJU12XDDDGPOJEO3
Post / EVSE Identifier #1EEDPGVLSBSVMBZ6WTRXBAPSUQ8A
Post / EVSE Identifier #2ES*TCB*E000513
Post / EVSE Identifier #31
Post / EVSE Identifier #4NDGWXQ9A5DIEBJOQYPUSTJGIZVJ
Post / EVSE Identifier #5ES*TCB*E000512
Post / EVSE Identifier #6RRUR4H5B9J68C2YZFV27HVSAL1T
Post / EVSE Identifier #7ES*TCB*E000511
Post / EVSE Identifier #8TRZFII1VZ4S6XZWXZWJ821TGNX1
Post / EVSE Identifier #9ES*TCB*E000510

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.67936 | Lon: -8.175407View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)🏨Hotel / Alojamiento
0 m away

Hotel Pazo de Bendoiro

Calle Bendoiro De Abaixo, S/N
Operator:Wenea Services Spain, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
43 kW(Fast)
4.7 km away

FERVI, S.L.

Corredoira,33
Operator:FERVI, SL.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
22 kW(Semi-fast)
5.1 km away

E-PO-Lalin-002

Trigueiriza,S/N
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.