50 kW• Fast🏨Hotel / AlojamientoActive in MITECO registry

TotalEnergies - Hotel Narcea

Autovia A-8, Sal. 234, Ctra. N-634, Km 5, Reocín (39590), Cantabria, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity6 bays (6 plugs)
GPS Coordinates43.35559, -4.11281
Official IDWQGHP5OOP5CPWZJHV8DP
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Reocín, belonging to the province of Cantabria (Cantabria, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
5Charging Bay #5
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeWQGHP5OOP5CPWZJHV8DP
Post / EVSE Identifier #1Q669YMHCW19JWSRKADKEQC4AJNR
Post / EVSE Identifier #2ES*TCB*E000638
Post / EVSE Identifier #31
Post / EVSE Identifier #4IKQ7SDW9IZO3PUMEMZS9PCCAATT
Post / EVSE Identifier #5ES*TCB*E000639
Post / EVSE Identifier #6OP3OVNJ6YLJEDREXUQPRA5PEZLN
Post / EVSE Identifier #7ES*TCB*E000640
Post / EVSE Identifier #87GHJGKQIKWTUCYE7W7XE05L6LT3
Post / EVSE Identifier #9ES*TCB*E000641
Post / EVSE Identifier #101WKZPANQYKGMGNR5W7KVBGYELPO
Post / EVSE Identifier #11ES*TCB*E000642
Post / EVSE Identifier #12MX1JACFG4HWC5CBNA74QLJAGYXK
Post / EVSE Identifier #13ES*TCB*E000643

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.355587 | Lon: -4.112814View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
1.4 km away

S-Reocin-001

Cantabrico,234
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
4 points • 5 plugs
Details
100 kW(Fast)🏨Hotel / Alojamiento
1.4 km away

Hotel Puerta de Santillana

Autovía Del Cantábrico, Km 234,S/N
Operator:CHARGING TOGETHER SL
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 5 plugs
Details
150 kW(Ultra-fast)
1.5 km away

Reocín, Spain

Autovía Del Cantábrico, Km 234
Operator:Tesla Spain SLU
CCS Combo 2Tipo 2 (Mennekes)
8 points • 16 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.