100 kW• Fast🏨Hotel / AlojamientoActive in MITECO registry

TotalEnergies - Hotel Mabu

Carretera Vigo, 37, Ourense (32001), Ourense, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity3 bays (3 plugs)
GPS Coordinates42.35537, -7.88343
Official IDCVZIEAUYD6PWIXGCJWSM
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ourense, belonging to the province of Ourense (Galicia, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeCVZIEAUYD6PWIXGCJWSM
Post / EVSE Identifier #1YC5HEJN7PQNMCCLJVDYOMFGX93B
Post / EVSE Identifier #2ES*TCB*E001056
Post / EVSE Identifier #31
Post / EVSE Identifier #4J4OY7WCDEAIELIT43IZQ6QY0GIQ
Post / EVSE Identifier #5ES*TCB*E001054
Post / EVSE Identifier #6CEO27FQUPK2HTD02OWNYCOP4OGO
Post / EVSE Identifier #7ES*TCB*E001053

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.355366 | Lon: -7.883431View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)🏨Hotel / Alojamiento
10 m away

Hotel Mabú

C/Carretera De Vigo, 37
Operator:Wenea Services Spain, S.L.
CCS Combo 2Tipo 2 (Mennekes)
3 points • 3 plugs
Details
22 kW(Semi-fast)
2.6 km away

Telpark - Plaza Alameda

Paseo Central Alameda Del Concejo, S/N,
Operator:MAKSU ESPAÑA SL
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)🅿️Parking
2.7 km away

62022014300014

Parking Las Mercedes - Rúa Arturo Pérez
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.