100 kW• Fast🏨Hotel / AlojamientoActive in MITECO registry

TotalEnergies - Hotel Ciudad de Borja

Ctra. N-122, Km 62,500, Borja (50540), Zaragoza, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates41.83176, -1.52334
Official ID6HDTCL4TZ3U9PYHBTJQS
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Borja, belonging to the province of Zaragoza (Aragón, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
4Charging Bay #4
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code6HDTCL4TZ3U9PYHBTJQS
Post / EVSE Identifier #1MLTJMXFC0DBWB1KA6UKTBV3SWBP
Post / EVSE Identifier #2ES*TCB*E000490
Post / EVSE Identifier #31
Post / EVSE Identifier #4FS40O32CC1IFFND5Z8QELTAN8Z2
Post / EVSE Identifier #5ES*TCB*E000491
Post / EVSE Identifier #63VNWY2XG7FQEBPSAWEUEYD0JZK3
Post / EVSE Identifier #7ES*TCB*E000492
Post / EVSE Identifier #8ETNLHBPBGWVWF6DFYG8HEFWOYZL
Post / EVSE Identifier #9ES*TCB*E000493

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.83176 | Lon: -1.52334View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
340 m away

Z-Borja-001

Poligono,1
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 5 plugs
Details
22 kW(Semi-fast)
7.2 km away

AYUNTAMIENTO DE BISIMBRE

Plaza de España S/N BISIMBRE, Zaragoza
Operator:FENIE ENERGIA, SA
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.