150 kW• Ultra-fastActive in MITECO registry

TotalEnergies - E.S. San Isidro

C. Sebastian De La Pl., 2A, Alcalá de Henares (28805), Madrid, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates40.48621, -3.36207
Official IDTHD6VKBQQWALVNPIRLKI
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alcalá de Henares, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
4Charging Bay #4
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeTHD6VKBQQWALVNPIRLKI
Post / EVSE Identifier #1VJ58X6VTSXFQVRSBBDN5RYZFDLJ
Post / EVSE Identifier #2ES*TCB*E000466
Post / EVSE Identifier #31
Post / EVSE Identifier #4LFR86XT42IYEQ6S14MN0CS7QKJJ
Post / EVSE Identifier #5ES*TCB*E000467
Post / EVSE Identifier #67LKPGPTWLJLNLPALOBSZUPFOC6B
Post / EVSE Identifier #7ES*TCB*E000468
Post / EVSE Identifier #8EPHIQACGYQ7DB6Q4YOSKHTOFGHR
Post / EVSE Identifier #9ES*TCB*E000469

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.486214 | Lon: -3.362073View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)🏬Centro Comercial
1.0 km away

Centro Comercial Alcalá Magna

C. Valentín Juara Bellot, 4, 28805 Alcalá d
Operator:Punto Recargas SL
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
4 points • 6 plugs
Details
22 kW(Semi-fast)
4.4 km away

AhorraMas Villalbilla

Mariano José De Larra 6
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.