190 kW• Ultra-fastActive in MITECO registry

TotalEnergies - E.S. Petrocar Caceres

Ctra. Miajadas, 1-A Sur, Cáceres (10005), Cáceres, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity4 bays (4 plugs)
GPS Coordinates39.45558, -6.36739
Official IDQQ7Z10WF1C0LVCVSRIKS
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cáceres, belonging to the province of Cáceres (Extremadura, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
190 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:380 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
4Charging Bay #4
1 connector available
CCS Combo 2
190 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:380 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeQQ7Z10WF1C0LVCVSRIKS
Post / EVSE Identifier #1UMNSSDHLUBL5CHECEG014ZPCHX0
Post / EVSE Identifier #2ES*TCB*E000458
Post / EVSE Identifier #31
Post / EVSE Identifier #4DMMCBXDRXITM0KETE1GSLCUTMJE
Post / EVSE Identifier #5ES*TCB*E000459
Post / EVSE Identifier #6XYDOILWSNFTR1P10MYNTJEAIFEU
Post / EVSE Identifier #7ES*TCB*E000460
Post / EVSE Identifier #8NVJIPQPSDHH0OWODP3XBSAMEO1R
Post / EVSE Identifier #9ES*TCB*E000461

Theoretical Charging Times at Maximum Power (190 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~6 min(~0.1 hours)
40 kWh Battery~13 min(~0.2 hours)
60 kWh Battery~19 min(~0.3 hours)
80 kWh Battery~25 min(~0.4 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.455585 | Lon: -6.367386View on OpenStreetMap →

Other Nearby Charging Stations

190 kW(Ultra-fast)
0 m away

E.S. Petrocar Cáceres

Ctra. Medellin, 1-A
Operator:WENEA EMOBILITY SERVICES S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)
910 m away

E-CC-Caceres-009

Torre De Floripes,41
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.