TotalEnergies - Ayto. Sant Antoni - Calonge

Plaza De La Concordia, 7, Calonge i Sant Antoni (17251), Girona, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity5 bays (5 plugs)
GPS Coordinates41.86126, 3.07626
Official IDER7QC3EKAQRABSDH3ASL
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Calonge i Sant Antoni, belonging to the province of Girona (Cataluña, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
2Charging Bay #2
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
5Charging Bay #5
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeER7QC3EKAQRABSDH3ASL
Post / EVSE Identifier #1Y3BYKVACPFR4S9KOZ7NQBFGXQEK
Post / EVSE Identifier #2ES*TCB*E001256
Post / EVSE Identifier #31
Post / EVSE Identifier #4NNBF0VBURPUYC1KN9AO96Z1TZJ8
Post / EVSE Identifier #5ES*TCB*E001257
Post / EVSE Identifier #6VH7RWELIVXZYOVDY2HXUD1Z8JFI
Post / EVSE Identifier #7ES*TCB*E001258
Post / EVSE Identifier #8WE0JF0YTZV0ET7XAXGCV50BW9WJ
Post / EVSE Identifier #9ES*TCB*E001259
Post / EVSE Identifier #10NQE1OAFD7SNCWDZXRDTR4QDVQ3F
Post / EVSE Identifier #11ES*TCB*E001260

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.86126 | Lon: 3.076261View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)🛒Supermercado Consum
2.3 km away

Supermercado Consum Calonge

Carrer Bergantí, 5, 17252 Fragata, Girona
Operator:ERANOVUM E-MOBILITY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
4.6 km away

E-GI-Palamos-001

Arnau Sa Bruguera,0
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
22 kW(Semi-fast)
5.1 km away

GI-CASTELLDARO-002

Pineda Del Mar,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.