150 kW• Ultra-fast24/7Active in MITECO registry

Torrent Southbound, Spain

Eess Galp, Ap-7, Km. 515, Torrent (46901), Valencia/València, Spain
Network OperatorTesla Spain SLU
Total Capacity2 bays (4 plugs)
GPS Coordinates39.40063, -0.49322
Official ID2024006376
Official Registry DateOct 22, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Torrent, belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the Tesla Spain SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:464 V
Amperage:400 A
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:464 V
Amperage:400 A
2Charging Bay #2
2 connectors available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:464 V
Amperage:400 A
Tipo 2 (Mennekes)
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:464 V
Amperage:400 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006376
Post / EVSE Identifier #1COD20240000043678PR00015815
Post / EVSE Identifier #2ES*TSL*E002KK3
Post / EVSE Identifier #3d9c3e60a-e6e4-424f-8b26-803e4263cb9d
Post / EVSE Identifier #464cc88cf-5e8b-413e-af44-58001e6c3778
Post / EVSE Identifier #5COD20240000043679PR00015816
Post / EVSE Identifier #6ES*TSL*E002KK0
Post / EVSE Identifier #7b885de3e-3e34-4ef2-aa4f-7396dd30f813
Post / EVSE Identifier #86e2d1f67-59e2-4ec7-bc34-cc3819080627

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Miercoles (00:00 - 23:59) Lunes (00:00 - 23:59) Viernes (00:00 - 23:59) Domingo (00:00 - 23:59) Sabado (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
✓COMPATIBLE CON TARJETAS CONTACTLESS

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.400634 | Lon: -0.493216View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
7.2 km away

E-46-Aldaia-001

De La Concordia,6
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
22 kW(Semi-fast)
7.8 km away

E-46-Catarroja-001

Filiberto Rodrigo,6
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)
8.4 km away

V-Paiporta-001

Acequia De Favara,5
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
4 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.