7.59 kW• Semi-fast24/7Active in MITECO registry

Torrent - Avenida País Valencià

Avenida El Vedat, S/N, Torrent (46900), Valencia/València, Spain
Network OperatorP-APP & WEB SERVICIOS DIGITALES S.L.U.
Total Capacity10 bays (10 plugs)
GPS Coordinates39.43575, -0.46724
Official IDYR2MIDXZBAN6M5Q0BGJL
Official Registry DateFeb 11, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Torrent, belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the P-APP & WEB SERVICIOS DIGITALES S.L.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
9Charging Bay #9
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A
10Charging Bay #10
1 connector available
Tipo 2 (Mennekes)
7.59 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:11 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeYR2MIDXZBAN6M5Q0BGJL
Post / EVSE Identifier #1H2YFS88A1CIGOTWKSP081WL1HZX
Post / EVSE Identifier #2ES*IPK*E6246222
Post / EVSE Identifier #31
Post / EVSE Identifier #4KASRLPSTZYHTOZFENQVHY12WREJ
Post / EVSE Identifier #5ES*IPK*E6246223
Post / EVSE Identifier #6TYUKMYKHKWUXZUAJ9RODMAD3BGK
Post / EVSE Identifier #7ES*IPK*E6246224
Post / EVSE Identifier #8BSCSDAB8HCZM5OXRNLCXBWE07MU
Post / EVSE Identifier #9ES*IPK*E6246225
Post / EVSE Identifier #10KBTA5FLH71LV35BIPWZ3OKA1F4N
Post / EVSE Identifier #11ES*IPK*E6246226
Post / EVSE Identifier #12CHE2P58VKMFVF3QNFDITEWXTHLP
Post / EVSE Identifier #13ES*IPK*E6246227
Post / EVSE Identifier #14AGOPY3VJ3XEEIOTVMMROOWWOSNC
Post / EVSE Identifier #15ES*IPK*E6246228
Post / EVSE Identifier #16EIJ5VICFSVIYQZ0YTXM4SNHLN6X
Post / EVSE Identifier #17ES*IPK*E6246229
Post / EVSE Identifier #18BZH8XODTUDB7MOCRGB9ZOD3VHEP
Post / EVSE Identifier #19ES*IPK*E6246221
Post / EVSE Identifier #20ZEACQKHGLWKBSBR4NOABEJSALEB
Post / EVSE Identifier #21ES*IPK*E6246220

Theoretical Charging Times at Maximum Power (7.59 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 38 min(~2.6 hours)
40 kWh Battery~5 h 16 min(~5.3 hours)
60 kWh Battery~7 h 54 min(~7.9 hours)
80 kWh Battery~10 h 32 min(~10.5 hours)

Opening Hours

Sabado (00:00 - 00:00) Lunes (00:00 - 00:00) Martes (00:00 - 00:00) Jueves (00:00 - 00:00) Miercoles (00:00 - 00:00) Domingo (00:00 - 00:00) Viernes (00:00 - 00:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.43575 | Lon: -0.467244View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
3.0 km away

E-46-Aldaia-001

De La Concordia,6
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.